# USPE Workstation Shelf Option: Configuration Sign-Off

Drawing / model: `USPE-SF`. Status: **UNSIGNED / NOT RELEASED FOR FABRICATION**.
This sheet records a proposed USPE configuration for review. It is not a completed engineering approval, an operating manual, a safety certification or an IP/legal clearance.

## Product and controlled artwork

- **Native product:** [USPE Workstation Shelf Option](https://www.mymortuarycooler.com/products/uspe-workstation-shelf-option); record `gid://shopify/Product/15444326154542`.
- **Covered SKU(s):** `USPE-SF-01`, `USPE-SF-02`, `USPE-SF-03`, `USPE-SF-04`.
- **Image:** `uspe-own-sf.jpg`; SHA-256 `d1db849e9fa1b61a582357fd659c8bbdc20d6aac1abc26a615c32421aa5f152f`.
- **Drawing:** `uspe-own-sf-signoff.jpg`; SHA-256 `c7dd4eb49f5ddfa6c1f6501f1942cf868506123e2045994c1cb557efad7ae36c`.
- **Editable CAD:** `uspe-sf.step`; SHA-256 `dd8d00e96e81231666db10de9f41de9bbfd44458128c3f2ff431a2ecaf879968`.

The illustration is an original CAD configuration view, not a photograph of a manufactured product. Purchased instruments, controls, electrical devices and plumbing components are proposed external layouts; their actual manufacturer, model, rating, fit and supply must be specified before release.

## Configuration to confirm

- Quantity: ____________________
- Quote / PO reference: ____________________
- Selected model / exact SKU: ____________________
- Materials / finish: ____________________
- Accessories / upgrades: ____________________
- Facility / delivery location: ____________________

Existing native selectors, not new promised capabilities:

- **Configuration request:** Single adjustable shelf review; Double adjustable shelf review; Fixed shelf review; Folding extension review.

## Proposed CAD envelope

| Drawing coordinate | Modeled overall span |
|---|---:|
| X across drawing | 510.0 mm |
| Y front-to-back | 380.0 mm |
| Z overall | 168.0 mm |

These values are measured from the proposed CAD, including modeled fixtures and overhangs. They are not verified production dimensions; do not substitute them for an approved shop drawing or assume the reference manufacturer’s ratings apply.

## Required reviews

- [ ] Confirm dimensions, working elevations, clearances and exact option interfaces.
- [ ] Fabricator confirms material grades, sections, gauges, welds, drain slopes and finish.
- [ ] Select actual purchased parts, approved BOM, supply and manufacturer documentation.
- [ ] Qualified reviewers address loads, stability, movement, restraints, electrical protection, plumbing/backflow and ventilation as applicable.
- [ ] Confirm image / CAD / quote revisions describe the same configuration.
- [ ] Obtain separate legal / patent / trade-dress and image-rights review where needed.

## Configuration acceptance

Name / organization: ____________________

Signature: ____________________    Date: ____________________

Accepted configuration and exceptions: ____________________

Configuration acceptance alone does not authorize fabrication or certify engineering, legal clearance, compatibility or regulatory compliance. Engineering approval: **not supplied**. IP/legal approval: **not supplied**.
