Veterinary necropsy stations and animal-science casework

USPE PET · Veterinary necropsy and animal science

Build the room around the procedure.

Compare necropsy stations, service sinks, flushing fixtures, water controls and integrated casework. Select an exact model, add relevant options and bring the equipment into one quote.

University teaching laboratories, veterinary diagnostic teams and animal-science research facilities can coordinate work positions, storage and cold-storage connections in the same project. Cleanroom-project requirements must be specified and reviewed; no cleanroom certification is implied.

11 families · 57 exact model configurations

Stainless steel casework is our specialty.

100% American-made laboratory casework, with standard cabinet models and fully custom builds. Choose the standard stainless appearance, powder-coated stainless steel or powder-coated steel, then specify body and front colors, glass, door style, hinges and pulls.

Build a dedicated animal-science casework schedule. Request a free planning drawing with your quote; confirm final grade, gauge, fabrication, utilities and component fit in the approved project scope.

Water Control Unit for Animal Necropsy CaseworkUSPE-PET-NC-WCU

USPE PET · Water controls

Water Control Unit for Animal Necropsy Casework

Coordinate a countertop water-control assembly with the animal-science sink, rinse outlet and utility schedule. Specify filler-spout handedness before ordering; this is not a freestanding sink.

Reference views preserve the existing equipment imagery. Alternate arrangements, older labels, drawings or separately supplied tables may be shown; included equipment follows the selected written scope.

Model USPE-PET-NC-WCU-01

Review quote and continue

Coordinate a countertop water-control assembly with the animal-science sink, rinse outlet and utility schedule. Specify filler-spout handedness before ordering; this is not a freestanding sink.

Veterinary necropsy configuration

  • Tall filler spout: accommodates a compatible filler equipment tank under the faucet and swivels out of the way when not in use. The master mixing valves set the water temperature supplied to the filler.
  • Table-rinse outlet: serrated connection for the included rinse hose, with controlled water flow for rinsing the necropsy table.
  • Backflow protection: a vacuum breaker protects the rinse connection and the hydro-aspirator water supply.
  • Master mixing valves: lever-operated adjustment for the table rinse and tall filler spout.
  • Hydro-aspirator assembly: dedicated water-control valve, built-in vacuum breaker and clear-sight drain with an air gap separating aspirated waste from the aspirator assembly.
  • In the box: the pre-plumbed unit with installed aspirator, faucet valves, goose-neck faucet and braided supply lines; the mixing water OUT 2 faucet (tall filler); a water wand; and two 10′ lengths of clear tubing.
  • Preassembled, pre-plumbed construction on a heavy-gauge stainless steel base plate for installation into a countertop cutout.
  • Countertop depth: catalog installation accommodates counters as shallow as 18 inches. The approved project drawing determines the cutout, service clearance and connections.
  • LW480 hydro-aspirator: chrome-plated brass assembly with built-in vacuum breaker and reversible-flow control. Confirm the current included assembly before requesting a replacement.
  • LW481 extension: chrome-plated brass hydro-aspirator extension; compatibility must be confirmed.
  • LW482 non-clogging aspirator head: helps keep large debris from entering the aspiration system.
  • AHT aspirator / trocar tubing: catalog dimensions 3/8-inch inside diameter and 5/8-inch outside diameter, referenced in 10-foot sections.
  • AHS splash / drain tubing: catalog dimensions 1-inch inside diameter and 1-1/4-inch outside diameter. Specify the application and requested length rather than substituting it for aspirator tubing.
  • Handedness follows the tall filler-spout position, not the hot/cold inlet side. Counter fasteners and sealant are not included.

Listed equipment specifications

Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.

Base plate18″ W × 14″ D heavy-gauge stainless steel, radiused corners
Mounting holes4, on 16″ × 12″ centers
Hot and cold supply½″ NPT each
Drain1½″ to a standard P-trap; 2″ on request
OutletsOUT 1 table rinse; OUT 2 tall filler to the compatible filler equipment
AspirationHydro-aspirator with vacuum breaker, clear-sight drain and air gap; dedicated cold water valve; water wand
CountertopDrop-in cutout; counters as shallow as 18″ deep

Choose the requested configuration

The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.

Coordinate animal-science casework

Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.

Veterinary casework · Room and cabinet planner · Options and part numbers

Installation, operation and care

Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.

Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.

Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.

Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.

Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.

Complete the necropsy room

Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote

Accessories that belong with this configuration

Quote the documented rinse hose, water wand and aspiration tubing by the existing assembly reference. Confirm bore, length, connection and replacement fit; do not substitute tubing between functions.

Coordinate animal-science casework · Specify material, glass and hardware

Planning, care and quote documents

Download the USPE-PET-NC-WCU planning and care guide. Includes every listed model code, utilities, care boundaries and the casework material, glass and door-style request form.

This is a planning reference, not a released installation or operating manual. Request the current project drawing and component instructions before commissioning.

Animal Necropsy Collection Sink StationUSPE-PET-NC-COL

USPE PET · Service sinks

Animal Necropsy Collection Sink Station

Organize the collection-sink position within an animal pathology work area. Review the collection route and permitted waste stream with the facility team before specifying drainage.

Reference views preserve the existing equipment imagery. Alternate arrangements, older labels, drawings or separately supplied tables may be shown; included equipment follows the selected written scope.

Model USPE-PET-NC-COL-01

Review quote and continue

Organize the collection-sink position within an animal pathology work area. Review the collection route and permitted waste stream with the facility team before specifying drainage.

Veterinary necropsy configuration

  • 304 stainless steel construction.
  • Factory-plumbed and wired platform; final facility connections require qualified installation.
  • Custom size, orientation and accessory requests reviewed with the written quote.

Listed equipment specifications

Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.

Overall dimensions, connection locations and the final included fixture schedule are confirmed by project drawing; no unverified dimensions are substituted.

Choose the requested configuration

The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.

Coordinate animal-science casework

Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.

Veterinary casework · Room and cabinet planner · Options and part numbers

Installation, operation and care

Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.

Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.

Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.

Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.

Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.

Complete the necropsy room

Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote

Accessories that belong with this configuration

Coordinate the collection route, splash management and required cabinet storage. Specify permitted waste and final plumbing before adding fixtures.

Coordinate animal-science casework · Specify material, glass and hardware

Planning, care and quote documents

Download the USPE-PET-NC-COL planning and care guide. Includes every listed model code, utilities, care boundaries and the casework material, glass and door-style request form.

This is a planning reference, not a released installation or operating manual. Request the current project drawing and component instructions before commissioning.

Wall-Mount Animal Necropsy Service StationUSPE-PET-NC-WM

USPE PET · Service sinks

Wall-Mount Animal Necropsy Service Station

Coordinate a wall-mounted utility and sink position for a veterinary necropsy room. Keep the supporting wall, service access and fixture arrangement on the approved room drawing.

Reference views preserve the existing equipment imagery. Alternate arrangements, older labels, drawings or separately supplied tables may be shown; included equipment follows the selected written scope.

Model USPE-PET-NC-WM-01

Review quote and continue

Coordinate a wall-mounted utility and sink position for a veterinary necropsy room. Keep the supporting wall, service access and fixture arrangement on the approved room drawing.

Veterinary necropsy configuration

  • Heavy-duty 304 stainless steel for corrosion resistance
  • Spray-hose assembly with cold-water control, nozzle, and 10-ft flexible hose
  • 0.75 HP waste disposer for efficient waste removal
  • Deluxe reverse-flow aspirator that helps prevent suction clogs
  • Hot and cold water unit with lever-handle operation
  • Utility faucet with swivel spout
  • Built-in GFCI duplex receptacle
  • Open, accessible back for plumbing access and modifications
  • Optional emergency eyewash attachment

Listed equipment specifications

Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.

Height71"
Length (left to right)30"
Depth (front to back)24.5"
Sink basin12" × 16" × 8"
Material304 stainless steel
Power110V with GFCI-protected receptacle

Choose the requested configuration

The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.

Coordinate animal-science casework

Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.

Veterinary casework · Room and cabinet planner · Options and part numbers

Installation, operation and care

Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.

Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.

Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.

Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.

Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.

Complete the necropsy room

Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote

Accessories that belong with this configuration

Review the supporting wall, mounting pattern, utility access and adjoining storage. A freestanding support or separate table is not included unless itemized.

Coordinate animal-science casework · Specify material, glass and hardware

Planning, care and quote documents

Download the USPE-PET-NC-WM planning and care guide. Includes every listed model code, utilities, care boundaries and the casework material, glass and door-style request form.

This is a planning reference, not a released installation or operating manual. Request the current project drawing and component instructions before commissioning.

Foot-Pedal Animal Necropsy Sink StationUSPE-PET-NC-FPS

USPE PET · Service sinks

Foot-Pedal Animal Necropsy Sink Station

Provide a foot-operated hot and cold water position beside the animal-science work area. The station supports hands-free fixture control; it does not replace a facility infection-control program.

Reference views preserve the existing equipment imagery. Alternate arrangements, older labels, drawings or separately supplied tables may be shown; included equipment follows the selected written scope.

Model USPE-PET-NC-FPS

Review quote and continue

Provide a foot-operated hot and cold water position beside the animal-science work area. The station supports hands-free fixture control; it does not replace a facility infection-control program.

Veterinary necropsy configuration

  • 304 stainless steel construction, corrosion-resistant and wipe-clean
  • Foot pedals for hands-free hot/cold water control
  • Standard spray hose included
  • Optional add-ons: emergency eyewash, hand spray, emergency shower (not included in base price)

Listed equipment specifications

Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.

Height to Backsplash40.00"
Height to Countertop36.00"
Width (L–R)30.00"
Depth (Front–Back)24.00"
Material304 Stainless Steel

Choose the requested configuration

The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.

Coordinate animal-science casework

Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.

Veterinary casework · Room and cabinet planner · Options and part numbers

Installation, operation and care

Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.

Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.

Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.

Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.

Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.

Complete the necropsy room

Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote

Accessories that belong with this configuration

Coordinate foot-control clearance, supply connections, splash protection and adjacent storage. Include the actual fixture and drain requirements.

Coordinate animal-science casework · Specify material, glass and hardware

Planning, care and quote documents

Download the USPE-PET-NC-FPS planning and care guide. Includes every listed model code, utilities, care boundaries and the casework material, glass and door-style request form.

This is a planning reference, not a released installation or operating manual. Request the current project drawing and component instructions before commissioning.

Center-Sink Veterinary Necropsy StationUSPE-PET-NC-CS

USPE PET · Necropsy stations

Center-Sink Veterinary Necropsy Station

Plan animal specimen preparation around a central sink, perforated specimen shelf and adjacent working positions. Confirm the usable specimen envelope and any ventilation request for the actual project.

Reference views preserve the existing equipment imagery. Alternate arrangements, older labels, drawings or separately supplied tables may be shown; included equipment follows the selected written scope.

Model USPE-PET-NC-CS

Review quote and continue

Plan animal specimen preparation around a central sink, perforated specimen shelf and adjacent working positions. Confirm the usable specimen envelope and any ventilation request for the actual project.

Veterinary necropsy configuration

  • 304 stainless-steel construction for durability and hygiene.
  • Large center sink with dissection rinse and control valve.
  • Hydro aspirator with vacuum breaker for fluid evacuation.
  • Flexible spray hose for targeted cleaning.
  • Gooseneck faucet with hot and cold water.
  • Large perforated specimen shelf.
  • GFCI receptacle with waterproof cover.
  • Overhead light.

Listed equipment specifications

Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.

Construction304 stainless steel
SinkLarge center sink with dissection rinse & control valve
Sink placementLeft, right, or center
AspiratorHydro aspirator with vacuum breaker
FaucetGooseneck, hot & cold
VentilationVented or non-vented
ShelfLarge perforated specimen shelf
ElectricalGFCI receptacle with waterproof cover, overhead light

Choose the requested configuration

The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.

Coordinate animal-science casework

Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.

Veterinary casework · Room and cabinet planner · Options and part numbers

Installation, operation and care

Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.

Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.

Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.

Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.

Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.

Complete the necropsy room

Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote

Accessories that belong with this configuration

Review the perforated specimen shelf, instrument staging, sink position and requested room ventilation together. Any ventilation option needs a defined connection and project review.

Coordinate animal-science casework · Specify material, glass and hardware

Planning, care and quote documents

Download the USPE-PET-NC-CS planning and care guide. Includes every listed model code, utilities, care boundaries and the casework material, glass and door-style request form.

This is a planning reference, not a released installation or operating manual. Request the current project drawing and component instructions before commissioning.

Right-Hand Veterinary Necropsy Sink StationUSPE-PET-NC-RH

USPE PET · Necropsy stations

Right-Hand Veterinary Necropsy Sink Station

Place the sink on the right of the veterinary necropsy workstation to match the room layout. Review the approach to the sink, instrument drawer and adjoining casework without assuming transfer-equipment compatibility.

Reference views preserve the existing equipment imagery. Alternate arrangements, older labels, drawings or separately supplied tables may be shown; included equipment follows the selected written scope.

Model USPE-PET-NC-RH-01

Review quote and continue

Place the sink on the right of the veterinary necropsy workstation to match the room layout. Review the approach to the sink, instrument drawer and adjoining casework without assuming transfer-equipment compatibility.

Veterinary necropsy configuration

  • Right-hand sink configuration for layout-specific prep rooms
  • 304 stainless steel construction for sanitation and corrosion resistance
  • Hydro aspirator with vacuum breaker (standard)
  • Dissection rinse valve and control valve
  • Flexible spray hose for cleanup and rinsing
  • Waterproof GFCI receptacle for wet work areas
  • Large instrument drawer and perforated specimen shelf
  • Custom specifications available (layout, plumbing, ventilation, size)
  • Any separate table pictured alongside the station is not included unless itemized in the quote.

Listed equipment specifications

Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.

Material304 stainless steel
Included utilitiesHydro aspirator, vacuum breaker, spray hose, dissection rinse valve, GFCI receptacle
StorageLarge instrument drawer and perforated specimen shelf

Choose the requested configuration

The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.

Coordinate animal-science casework

Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.

Veterinary casework · Room and cabinet planner · Options and part numbers

Installation, operation and care

Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.

Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.

Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.

Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.

Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.

Complete the necropsy room

Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote

Accessories that belong with this configuration

Match the right-hand sink to the room approach. Separately itemize adjacent casework, instrument storage, lighting and any table pictured.

Coordinate animal-science casework · Specify material, glass and hardware

Planning, care and quote documents

Download the USPE-PET-NC-RH planning and care guide. Includes every listed model code, utilities, care boundaries and the casework material, glass and door-style request form.

This is a planning reference, not a released installation or operating manual. Request the current project drawing and component instructions before commissioning.

Left-Hand Veterinary Necropsy Sink StationUSPE-PET-NC-LH

USPE PET · Necropsy stations

Left-Hand Veterinary Necropsy Sink Station

Place the sink on the left of the veterinary necropsy workstation to match the room layout. Coordinate instrument staging and service access with the neighboring animal-science cabinets.

Reference views preserve the existing equipment imagery. Alternate arrangements, older labels, drawings or separately supplied tables may be shown; included equipment follows the selected written scope.

Model USPE-PET-NC-LH-01

Review quote and continue

Place the sink on the left of the veterinary necropsy workstation to match the room layout. Coordinate instrument staging and service access with the neighboring animal-science cabinets.

Veterinary necropsy configuration

  • Left-hand sink configuration for layout-specific prep rooms
  • 304 stainless steel construction for sanitation and corrosion resistance
  • Hydro aspirator with vacuum breaker (standard)
  • Dissection rinse valve and control valve
  • Flexible spray hose for cleanup and rinsing
  • Waterproof GFCI receptacle for wet work areas
  • Large instrument drawer and perforated specimen shelf
  • Custom specifications available (layout, plumbing, ventilation, size)
  • Any separate table pictured alongside the station is not included unless itemized in the quote.

Listed equipment specifications

Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.

Material304 stainless steel
Included utilitiesHydro aspirator, vacuum breaker, spray hose, dissection rinse valve, GFCI receptacle
StorageLarge instrument drawer and perforated specimen shelf

Choose the requested configuration

The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.

Coordinate animal-science casework

Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.

Veterinary casework · Room and cabinet planner · Options and part numbers

Installation, operation and care

Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.

Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.

Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.

Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.

Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.

Complete the necropsy room

Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote

Accessories that belong with this configuration

Match the left-hand sink to the room approach. Separately itemize adjacent casework, instrument storage, lighting and any table pictured.

Coordinate animal-science casework · Specify material, glass and hardware

Planning, care and quote documents

Download the USPE-PET-NC-LH planning and care guide. Includes every listed model code, utilities, care boundaries and the casework material, glass and door-style request form.

This is a planning reference, not a released installation or operating manual. Request the current project drawing and component instructions before commissioning.

Stainless Animal Necropsy Sink Service StationUSPE-PET-NC-SS

USPE PET · Service sinks

Stainless Animal Necropsy Sink Service Station

Coordinate an integral sink, continuous rinse, water controls and spray hose in one animal-science service station. Select the eyewash arrangement, drain option and additional receptacle configuration for written review.

Reference views preserve the existing equipment imagery. Alternate arrangements, older labels, drawings or separately supplied tables may be shown; included equipment follows the selected written scope.

Model USPE-PET-NC-SS-01

Review quote and continue

Coordinate an integral sink, continuous rinse, water controls and spray hose in one animal-science service station. Select the eyewash arrangement, drain option and additional receptacle configuration for written review.

Veterinary necropsy configuration

  • Integral 304 stainless sink basin, 20″ projection from the cabinet
  • Continuous rinse
  • Hot and cold gooseneck mixing faucet with paddle / wrist-blade controls
  • Hydro aspirator with vacuum breaker and flexible hose
  • Spray hose with 8 ft flexible hose
  • GFCI duplex receptacle, 120 V
  • Removable back cover for plumbing access
  • 14-gauge (2 mm) 304 stainless steel, heliarc welded and polished, crevice-free
  • Floor or wall mount

Listed equipment specifications

Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.

Overall32″ W × 40″ D × 41″ H
Cabinet depth20″ (sink basin projects a further 20″)
Sink rim height23″ from the floor
Clearance under basin9½″
Overall height70½″ to the top of the faucet spout
Construction304 stainless steel, 14 gauge (2 mm), heliarc welded, polished
FaucetHot/cold gooseneck mixing faucet, paddle / wrist-blade controls
AspiratorHydro aspirator with vacuum breaker and flexible hose; cold water
Spray hose8 ft flexible hose sprayer; cold water
Electrical120 V, 60 Hz, 1 phase, 15 A; GFCI duplex receptacle
Water supplyHot and cold; 58–60 psi and 4 GPM at the hydro aspirator
Rear rough-in1½″ drain centered 16″ from the left, 7½″ above the floor; hot ½″ at 12″ and cold ½″ at 20″ from the left, both 15″ above the floor; 4″ × 4″ junction box centered 27″ from the left, 21″ above the floor ( rough-in sheet )
MountingFloor or wall mount

Choose the requested configuration

The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.

Coordinate animal-science casework

Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.

Veterinary casework · Room and cabinet planner · Options and part numbers

Installation, operation and care

Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.

Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.

Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.

Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.

Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.

Complete the necropsy room

Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote

Accessories that belong with this configuration

Use the listed eyewash, drain and receptacle choices for this model. Keep requested hoses, water-control changes and added storage separate from the base configuration.

Coordinate animal-science casework · Specify material, glass and hardware

Planning, care and quote documents

Download the USPE-PET-NC-SS planning and care guide. Includes every listed model code, utilities, care boundaries and the casework material, glass and door-style request form.

This is a planning reference, not a released installation or operating manual. Request the current project drawing and component instructions before commissioning.

Animal Necropsy Flushing StationUSPE-PET-NC-FS

USPE PET · Flushing stations

Animal Necropsy Flushing Station

Plan a dedicated flushing-fixture position for an animal necropsy suite. The vitreous china bowl, splash cover and service cabinet form a utility station; permitted waste and tissue-disposal routes require facility approval.

Reference views preserve the existing equipment imagery. Alternate arrangements, older labels, drawings or separately supplied tables may be shown; included equipment follows the selected written scope.

Model USPE-PET-NC-FS-01

Review quote and continue

Plan a dedicated flushing-fixture position for an animal necropsy suite. The vitreous china bowl, splash cover and service cabinet form a utility station; permitted waste and tissue-disposal routes require facility approval.

Veterinary necropsy configuration

  • Large white vitreous china flushing bowl, wall-hung on the cabinet face
  • Splash cover with a port for the necropsy table drain hose
  • Push-button flush valve to clear the bowl
  • Hot and cold mixing faucet with tall gooseneck spout and wrist-blade handles
  • Hydro aspirator with vacuum breaker and reverse flow to relieve suction clogs
  • Spray hose assembly with spray nozzle and 8 ft flexible hose
  • Backflow protection on all water fixtures
  • GFCI duplex receptacle, 120 V, with waterproof cover
  • Front service and access panel; open rear for hot, cold and drain connections
  • Heliarc-welded, polished 304 stainless steel cabinet
  • Floor or wall mount

Listed equipment specifications

Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.

Cabinet32″ W × 20″ D × 40″ H to the top deck
Overall depth46″ including the flushing bowl
Overall height70½″ to the top of the faucet spout
Bowl rim height16½″ from the floor
Rear rough-in1½″ drain centered 16″ from the left, 7″ above the floor; hot ½″ at 12″ and cold ½″ at 20″ from the left, both 15″ above the floor; 4″ × 4″ junction box centered 27″ from the left, 21″ above the floor ( rough-in sheet )
Construction304 stainless steel, heliarc welded, polished finish
Flushing fixtureWall-hung vitreous china bowl with push-button flush valve
FaucetHot/cold mixing, tall gooseneck spout, wrist-blade handles
AspiratorHydro aspirator, vacuum breaker, reverse flow; cold water
Spray hoseSpray nozzle, 8 ft flexible hose
Electrical120 V, 60 Hz, 1 phase, 15 A; GFCI duplex receptacle with waterproof cover
Water supplyHot and cold; 58–60 psi and 4 GPM at the hydro aspirator
Flush valve pressure10–100 psi; low-consumption valves need 25 psi running pressure
MountingFloor or wall mount

Choose the requested configuration

The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.

Coordinate animal-science casework

Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.

Veterinary casework · Room and cabinet planner · Options and part numbers

Installation, operation and care

Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.

Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.

Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.

Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.

Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.

Complete the necropsy room

Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote

Accessories that belong with this configuration

Review the flushing bowl, splash cover, supply, drain and permitted waste route. This is not a disposal approval or a replacement for facility waste procedures.

Coordinate animal-science casework · Specify material, glass and hardware

Planning, care and quote documents

Download the USPE-PET-NC-FS planning and care guide. Includes every listed model code, utilities, care boundaries and the casework material, glass and door-style request form.

This is a planning reference, not a released installation or operating manual. Request the current project drawing and component instructions before commissioning.

Animal Science Necropsy Table with SinkUSPE-PET-NC-ST

USPE PET · Necropsy stations

Animal Science Necropsy Table with Sink

Request the existing sink-equipped table platform for a dedicated animal-science necropsy arrangement. Select the documented left- or right-hand sink; specimen support, capacity and the proposed necropsy application require written review.

Reference views preserve the existing equipment imagery. Alternate arrangements, older labels, drawings or separately supplied tables may be shown; included equipment follows the selected written scope.

Model USPE-PET-NC-ST-01

Review quote and continue

Request the existing sink-equipped table platform for a dedicated animal-science necropsy arrangement. Select the documented left- or right-hand sink; specimen support, capacity and the proposed necropsy application require written review.

Veterinary necropsy configuration

  • Integrated Sink and Faucet Equipped with a built-in sink and faucet, perfect for procedures requiring immediate access to water, enhancing hygiene and efficiency.
  • Superior Stainless Steel Craftsmanship Constructed in the USA using high-grade stainless steel, this table features a marine edge to prevent liquid spills and ensure longevity in even the busiest vet offices.
  • Custom Configurations Available Choose from a range of custom lengths, depths, and working heights to integrate seamlessly with your facility’s layout.
  • Storage Options & Color Choices Add drawers or doors, available in classic stainless or a range of powder-coated finishes. Tailor the unit to match your clinic’s workflow and aesthetic.
  • Marine-edge worktop with integrated sink and faucet.
  • Custom dimensions, drawer/door layouts and powder-coated storage finishes are quote requests, not verified base specifications.

Listed equipment specifications

Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.

LEFT HAND SINKSink basin and faucet installed on the left-hand side
RIGHT HAND SINKSink basin and faucet installed on the right-hand side

Choose the requested configuration

The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.

Coordinate animal-science casework

Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.

Veterinary casework · Room and cabinet planner · Options and part numbers

Installation, operation and care

Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.

Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.

Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.

Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.

Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.

Complete the necropsy room

Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote

Accessories that belong with this configuration

Confirm the documented left- or right-hand sink. Drawers, doors, finish changes, capacity and veterinary necropsy suitability need their own written scope.

Coordinate animal-science casework · Specify material, glass and hardware

Planning, care and quote documents

Download the USPE-PET-NC-ST planning and care guide. Includes every listed model code, utilities, care boundaries and the casework material, glass and door-style request form.

This is a planning reference, not a released installation or operating manual. Request the current project drawing and component instructions before commissioning.

Animal Necropsy Station and Casework PackageUSPE-PET-NC-CW

USPE PET · Casework packages

Animal Necropsy Station and Casework Package

Coordinate an animal necropsy station with integrated cabinet storage and water-control plumbing. Build an itemized room schedule so the station, cabinet sizes, finishes and installation responsibilities remain clear.

Reference views preserve the existing equipment imagery. Alternate arrangements, older labels, drawings or separately supplied tables may be shown; included equipment follows the selected written scope.

Model USPE-PET-NC-CW-01

Review quote and continue

Coordinate an animal necropsy station with integrated cabinet storage and water-control plumbing. Build an itemized room schedule so the station, cabinet sizes, finishes and installation responsibilities remain clear.

Veterinary necropsy configuration

  • 304 stainless steel with welded construction.
  • Integrated station, sink, water-control plumbing and casework storage.
  • Configurable cabinet storage; final cabinet schedule and included components are itemized in the quote.

Listed equipment specifications

Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.

Overall dimensions, connection locations and the final included fixture schedule are confirmed by project drawing; no unverified dimensions are substituted.

Choose the requested configuration

The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.

Coordinate animal-science casework

Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.

Veterinary casework · Room and cabinet planner · Options and part numbers

Installation, operation and care

Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.

Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.

Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.

Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.

Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.

Complete the necropsy room

Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote

Accessories that belong with this configuration

Prepare an itemized station and cabinet schedule. Coordinate the water control, top, sink, storage, service clearances and requested glass or hardware by cabinet model.

Coordinate animal-science casework · Specify material, glass and hardware

Planning, care and quote documents

Download the USPE-PET-NC-CW planning and care guide. Includes every listed model code, utilities, care boundaries and the casework material, glass and door-style request form.

This is a planning reference, not a released installation or operating manual. Request the current project drawing and component instructions before commissioning.

Examination and treatment models are listed separately below. They are not automatically substitutes for a veterinary necropsy station.