Coordinate an animal necropsy station with integrated cabinet storage and water-control plumbing. Build an itemized room schedule so the station, cabinet sizes, finishes and installation responsibilities remain clear.
Veterinary necropsy configuration
- 304 stainless steel with welded construction.
- Integrated station, sink, water-control plumbing and casework storage.
- Configurable cabinet storage; final cabinet schedule and included components are itemized in the quote.
Listed equipment specifications
Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.
Overall dimensions, connection locations and the final included fixture schedule are confirmed by project drawing; no unverified dimensions are substituted.
Choose the requested configuration
The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.
Coordinate animal-science casework
Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.
Veterinary casework · Room and cabinet planner · Options and part numbers
Installation, operation and care
Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.
Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.
Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.
Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.
Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.
Complete the necropsy room
Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote