- Home
- Veterinary & Pet Cremation Equipment | Coolers, Necropsy Tables & Lifts
Welcome to USPE PET.
Affordable veterinary necropsy equipment. American-made animal-science casework.
Value-driven necropsy stations, exam tables, specimen handling and stainless casework for veterinary schools, diagnostic laboratories, shelters and pet aftercare. Choose your models and configurations, then bring your facility project together in one quote.
Trusted By Leading Diagnostic & Medical Laboratories
Hospitals, health systems, universities, medical examiner offices, forensic centers and public agencies equipped by U.S. Pathology Equipment and American Mortuary Coolers since March 2009.
Customer names and marks identify organizations served, not sponsorship or endorsement. Government & institutional buyers · Trust, security & compliance
Explore USPE PET equipment
Browse by procedure or room, then review the models for your animal facility.
USPE PET · Veterinary & animal-science casework
Casework built for the necropsy room
Stainless steel base, wall, tall, mobile and sink cabinets fabricated in the United States, with powder-coated stainless steel or 18-gauge powder-coated steel available. Plan a necropsy suite, veterinary teaching laboratory, diagnostic bench or animal-science research room and keep every cabinet, finish and hardware selection on one USPE PET quote.
Downdraft, backdraft, hooded, standard and mobile necropsy stations plus small-animal, hydraulic and lift-and-tilt necropsy tables in stainless steel for veterinary schools, diagnostic laboratories and animal-science research. Compare sink, flushing and water-control stations.
Wall-mount, knee-space and sink-equipped veterinary examination and treatment tables for clinics, hospitals and shelters. Clinical exam tables are separate models from an approved necropsy configuration.
Dissection tables, dissecting pans, grossing stations, scales and the animal-science specimen workstation package for teaching and diagnostic laboratories.
Upright, vault-style and walk-in coolers built by American Mortuary Coolers in Johnson City, Tennessee, sized for animal holding, necropsy cold storage and pet aftercare facilities.
Glass-door and solid-door laboratory refrigerators for specimen, reagent and vaccine storage alongside the necropsy room.
Necropsy stations, sinks and water control
Choose a veterinary necropsy table for the procedure.
Compare center-sink, left-hand and right-hand station layouts, then review the exact model and its reference documents. Specify usable specimen dimensions, operator access, drainage and transfer requirements; load capacity and ventilation must be confirmed for the selected configuration.
A veterinary post-mortem table needs a documented procedure-specific scope. An examination table is a separate clinical model, not a substitute for an approved necropsy configuration.
USPE PET · Veterinary necropsy and animal science
Build the room around the procedure.
Compare necropsy stations, service sinks, flushing fixtures, water controls and integrated casework. Select an exact model, add relevant options and bring the equipment into one quote.
University teaching laboratories, veterinary diagnostic teams and animal-science research facilities can coordinate work positions, storage and cold-storage connections in the same project. Cleanroom-project requirements must be specified and reviewed; no cleanroom certification is implied.
11 families · 57 exact model configurations

Water controls
Water Control Unit for Animal Necropsy Casework
Coordinate a countertop water-control assembly with the animal-science sink, rinse outlet and utility schedule. Specify filler-spout handedness before ordering; this is not a freestanding sink.
3 configurations · Review models and quote
Service sinks
Animal Necropsy Collection Sink Station
Organize the collection-sink position within an animal pathology work area. Review the collection route and permitted waste stream with the facility team before specifying drainage.
2 configurations · Review models and quote
Service sinks
Wall-Mount Animal Necropsy Service Station
Coordinate a wall-mounted utility and sink position for a veterinary necropsy room. Keep the supporting wall, service access and fixture arrangement on the approved room drawing.
2 configurations · Review models and quote
Service sinks
Foot-Pedal Animal Necropsy Sink Station
Provide a foot-operated hot and cold water position beside the animal-science work area. The station supports hands-free fixture control; it does not replace a facility infection-control program.
1 configuration · Review models and quote
Necropsy stations
Center-Sink Veterinary Necropsy Station
Plan animal specimen preparation around a central sink, perforated specimen shelf and adjacent working positions. Confirm the usable specimen envelope and any ventilation request for the actual project.
1 configuration · Review models and quote
Necropsy stations
Right-Hand Veterinary Necropsy Sink Station
Place the sink on the right of the veterinary necropsy workstation to match the room layout. Review the approach to the sink, instrument drawer and adjoining casework without assuming transfer-equipment compatibility.
2 configurations · Review models and quote
Necropsy stations
Left-Hand Veterinary Necropsy Sink Station
Place the sink on the left of the veterinary necropsy workstation to match the room layout. Coordinate instrument staging and service access with the neighboring animal-science cabinets.
2 configurations · Review models and quote
Service sinks
Stainless Animal Necropsy Sink Service Station
Coordinate an integral sink, continuous rinse, water controls and spray hose in one animal-science service station. Select the eyewash arrangement, drain option and additional receptacle configuration for written review.
30 configurations · Review models and quote
Flushing stations
Animal Necropsy Flushing Station
Plan a dedicated flushing-fixture position for an animal necropsy suite. The vitreous china bowl, splash cover and service cabinet form a utility station; permitted waste and tissue-disposal routes require facility approval.
10 configurations · Review models and quote
Necropsy stations
Animal Science Necropsy Table with Sink
Request the existing sink-equipped table platform for a dedicated animal-science necropsy arrangement. Select the documented left- or right-hand sink; specimen support, capacity and the proposed necropsy application require written review.
2 configurations · Review models and quote
Casework packages
Animal Necropsy Station and Casework Package
Coordinate an animal necropsy station with integrated cabinet storage and water-control plumbing. Build an itemized room schedule so the station, cabinet sizes, finishes and installation responsibilities remain clear.
2 configurations · Review models and quoteStainless steel casework is our specialty.
100% American-made laboratory casework, with standard cabinet models and fully custom builds. Choose the standard stainless appearance, powder-coated stainless steel or powder-coated steel, then specify body and front colors, glass, door style, hinges and pulls.
Build a dedicated animal-science casework schedule. Request a free planning drawing with your quote; confirm final grade, gauge, fabrication, utilities and component fit in the approved project scope.
Water Control Unit for Animal Necropsy CaseworkUSPE-PET-NC-WCU
USPE PET · Water controls
Water Control Unit for Animal Necropsy Casework
Coordinate a countertop water-control assembly with the animal-science sink, rinse outlet and utility schedule. Specify filler-spout handedness before ordering; this is not a freestanding sink.





Reference views preserve the existing equipment imagery. Alternate arrangements, older labels, drawings or separately supplied tables may be shown; included equipment follows the selected written scope.
Coordinate a countertop water-control assembly with the animal-science sink, rinse outlet and utility schedule. Specify filler-spout handedness before ordering; this is not a freestanding sink.
Veterinary necropsy configuration
- Tall filler spout: accommodates a compatible filler equipment tank under the faucet and swivels out of the way when not in use. The master mixing valves set the water temperature supplied to the filler.
- Table-rinse outlet: serrated connection for the included rinse hose, with controlled water flow for rinsing the necropsy table.
- Backflow protection: a vacuum breaker protects the rinse connection and the hydro-aspirator water supply.
- Master mixing valves: lever-operated adjustment for the table rinse and tall filler spout.
- Hydro-aspirator assembly: dedicated water-control valve, built-in vacuum breaker and clear-sight drain with an air gap separating aspirated waste from the aspirator assembly.
- In the box: the pre-plumbed unit with installed aspirator, faucet valves, goose-neck faucet and braided supply lines; the mixing water OUT 2 faucet (tall filler); a water wand; and two 10′ lengths of clear tubing.
- Preassembled, pre-plumbed construction on a heavy-gauge stainless steel base plate for installation into a countertop cutout.
- Countertop depth: catalog installation accommodates counters as shallow as 18 inches. The approved project drawing determines the cutout, service clearance and connections.
- LW480 hydro-aspirator: chrome-plated brass assembly with built-in vacuum breaker and reversible-flow control. Confirm the current included assembly before requesting a replacement.
- LW481 extension: chrome-plated brass hydro-aspirator extension; compatibility must be confirmed.
- LW482 non-clogging aspirator head: helps keep large debris from entering the aspiration system.
- AHT aspirator / trocar tubing: catalog dimensions 3/8-inch inside diameter and 5/8-inch outside diameter, referenced in 10-foot sections.
- AHS splash / drain tubing: catalog dimensions 1-inch inside diameter and 1-1/4-inch outside diameter. Specify the application and requested length rather than substituting it for aspirator tubing.
- Handedness follows the tall filler-spout position, not the hot/cold inlet side. Counter fasteners and sealant are not included.
Listed equipment specifications
Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.
| Base plate | 18″ W × 14″ D heavy-gauge stainless steel, radiused corners |
|---|---|
| Mounting holes | 4, on 16″ × 12″ centers |
| Hot and cold supply | ½″ NPT each |
| Drain | 1½″ to a standard P-trap; 2″ on request |
| Outlets | OUT 1 table rinse; OUT 2 tall filler to the compatible filler equipment |
| Aspiration | Hydro-aspirator with vacuum breaker, clear-sight drain and air gap; dedicated cold water valve; water wand |
| Countertop | Drop-in cutout; counters as shallow as 18″ deep |
Choose the requested configuration
The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.
Coordinate animal-science casework
Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.
Veterinary casework · Room and cabinet planner · Options and part numbers
Installation, operation and care
Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.
Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.
Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.
Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.
Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.
Complete the necropsy room
Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote
Accessories that belong with this configuration
Quote the documented rinse hose, water wand and aspiration tubing by the existing assembly reference. Confirm bore, length, connection and replacement fit; do not substitute tubing between functions.
Coordinate animal-science casework · Specify material, glass and hardware
Planning, care and quote documents
Download the USPE-PET-NC-WCU planning and care guide. Includes every listed model code, utilities, care boundaries and the casework material, glass and door-style request form.
This is a planning reference, not a released installation or operating manual. Request the current project drawing and component instructions before commissioning.
Animal Necropsy Collection Sink StationUSPE-PET-NC-COL
USPE PET · Service sinks
Animal Necropsy Collection Sink Station
Organize the collection-sink position within an animal pathology work area. Review the collection route and permitted waste stream with the facility team before specifying drainage.







Reference views preserve the existing equipment imagery. Alternate arrangements, older labels, drawings or separately supplied tables may be shown; included equipment follows the selected written scope.
Organize the collection-sink position within an animal pathology work area. Review the collection route and permitted waste stream with the facility team before specifying drainage.
Veterinary necropsy configuration
- 304 stainless steel construction.
- Factory-plumbed and wired platform; final facility connections require qualified installation.
- Custom size, orientation and accessory requests reviewed with the written quote.
Listed equipment specifications
Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.
Overall dimensions, connection locations and the final included fixture schedule are confirmed by project drawing; no unverified dimensions are substituted.
Choose the requested configuration
The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.
Coordinate animal-science casework
Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.
Veterinary casework · Room and cabinet planner · Options and part numbers
Installation, operation and care
Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.
Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.
Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.
Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.
Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.
Complete the necropsy room
Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote
Accessories that belong with this configuration
Coordinate the collection route, splash management and required cabinet storage. Specify permitted waste and final plumbing before adding fixtures.
Coordinate animal-science casework · Specify material, glass and hardware
Planning, care and quote documents
Download the USPE-PET-NC-COL planning and care guide. Includes every listed model code, utilities, care boundaries and the casework material, glass and door-style request form.
This is a planning reference, not a released installation or operating manual. Request the current project drawing and component instructions before commissioning.
Wall-Mount Animal Necropsy Service StationUSPE-PET-NC-WM
USPE PET · Service sinks
Wall-Mount Animal Necropsy Service Station
Coordinate a wall-mounted utility and sink position for a veterinary necropsy room. Keep the supporting wall, service access and fixture arrangement on the approved room drawing.





Reference views preserve the existing equipment imagery. Alternate arrangements, older labels, drawings or separately supplied tables may be shown; included equipment follows the selected written scope.
Coordinate a wall-mounted utility and sink position for a veterinary necropsy room. Keep the supporting wall, service access and fixture arrangement on the approved room drawing.
Veterinary necropsy configuration
- Heavy-duty 304 stainless steel for corrosion resistance
- Spray-hose assembly with cold-water control, nozzle, and 10-ft flexible hose
- 0.75 HP waste disposer for efficient waste removal
- Deluxe reverse-flow aspirator that helps prevent suction clogs
- Hot and cold water unit with lever-handle operation
- Utility faucet with swivel spout
- Built-in GFCI duplex receptacle
- Open, accessible back for plumbing access and modifications
- Optional emergency eyewash attachment
Listed equipment specifications
Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.
| Height | 71" |
|---|---|
| Length (left to right) | 30" |
| Depth (front to back) | 24.5" |
| Sink basin | 12" × 16" × 8" |
| Material | 304 stainless steel |
| Power | 110V with GFCI-protected receptacle |
Choose the requested configuration
The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.
Coordinate animal-science casework
Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.
Veterinary casework · Room and cabinet planner · Options and part numbers
Installation, operation and care
Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.
Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.
Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.
Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.
Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.
Complete the necropsy room
Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote
Accessories that belong with this configuration
Review the supporting wall, mounting pattern, utility access and adjoining storage. A freestanding support or separate table is not included unless itemized.
Coordinate animal-science casework · Specify material, glass and hardware
Planning, care and quote documents
Download the USPE-PET-NC-WM planning and care guide. Includes every listed model code, utilities, care boundaries and the casework material, glass and door-style request form.
This is a planning reference, not a released installation or operating manual. Request the current project drawing and component instructions before commissioning.
Foot-Pedal Animal Necropsy Sink StationUSPE-PET-NC-FPS
USPE PET · Service sinks
Foot-Pedal Animal Necropsy Sink Station
Provide a foot-operated hot and cold water position beside the animal-science work area. The station supports hands-free fixture control; it does not replace a facility infection-control program.




Reference views preserve the existing equipment imagery. Alternate arrangements, older labels, drawings or separately supplied tables may be shown; included equipment follows the selected written scope.
Provide a foot-operated hot and cold water position beside the animal-science work area. The station supports hands-free fixture control; it does not replace a facility infection-control program.
Veterinary necropsy configuration
- 304 stainless steel construction, corrosion-resistant and wipe-clean
- Foot pedals for hands-free hot/cold water control
- Standard spray hose included
- Optional add-ons: emergency eyewash, hand spray, emergency shower (not included in base price)
Listed equipment specifications
Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.
| Height to Backsplash | 40.00" |
|---|---|
| Height to Countertop | 36.00" |
| Width (L–R) | 30.00" |
| Depth (Front–Back) | 24.00" |
| Material | 304 Stainless Steel |
Choose the requested configuration
The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.
Coordinate animal-science casework
Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.
Veterinary casework · Room and cabinet planner · Options and part numbers
Installation, operation and care
Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.
Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.
Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.
Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.
Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.
Complete the necropsy room
Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote
Accessories that belong with this configuration
Coordinate foot-control clearance, supply connections, splash protection and adjacent storage. Include the actual fixture and drain requirements.
Coordinate animal-science casework · Specify material, glass and hardware
Planning, care and quote documents
Download the USPE-PET-NC-FPS planning and care guide. Includes every listed model code, utilities, care boundaries and the casework material, glass and door-style request form.
This is a planning reference, not a released installation or operating manual. Request the current project drawing and component instructions before commissioning.
Center-Sink Veterinary Necropsy StationUSPE-PET-NC-CS
USPE PET · Necropsy stations
Center-Sink Veterinary Necropsy Station
Plan animal specimen preparation around a central sink, perforated specimen shelf and adjacent working positions. Confirm the usable specimen envelope and any ventilation request for the actual project.





Reference views preserve the existing equipment imagery. Alternate arrangements, older labels, drawings or separately supplied tables may be shown; included equipment follows the selected written scope.
Plan animal specimen preparation around a central sink, perforated specimen shelf and adjacent working positions. Confirm the usable specimen envelope and any ventilation request for the actual project.
Veterinary necropsy configuration
- 304 stainless-steel construction for durability and hygiene.
- Large center sink with dissection rinse and control valve.
- Hydro aspirator with vacuum breaker for fluid evacuation.
- Flexible spray hose for targeted cleaning.
- Gooseneck faucet with hot and cold water.
- Large perforated specimen shelf.
- GFCI receptacle with waterproof cover.
- Overhead light.
Listed equipment specifications
Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.
| Construction | 304 stainless steel |
|---|---|
| Sink | Large center sink with dissection rinse & control valve |
| Sink placement | Left, right, or center |
| Aspirator | Hydro aspirator with vacuum breaker |
| Faucet | Gooseneck, hot & cold |
| Ventilation | Vented or non-vented |
| Shelf | Large perforated specimen shelf |
| Electrical | GFCI receptacle with waterproof cover, overhead light |
Choose the requested configuration
The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.
Coordinate animal-science casework
Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.
Veterinary casework · Room and cabinet planner · Options and part numbers
Installation, operation and care
Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.
Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.
Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.
Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.
Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.
Complete the necropsy room
Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote
Accessories that belong with this configuration
Review the perforated specimen shelf, instrument staging, sink position and requested room ventilation together. Any ventilation option needs a defined connection and project review.
Coordinate animal-science casework · Specify material, glass and hardware
Planning, care and quote documents
Download the USPE-PET-NC-CS planning and care guide. Includes every listed model code, utilities, care boundaries and the casework material, glass and door-style request form.
This is a planning reference, not a released installation or operating manual. Request the current project drawing and component instructions before commissioning.
Right-Hand Veterinary Necropsy Sink StationUSPE-PET-NC-RH
USPE PET · Necropsy stations
Right-Hand Veterinary Necropsy Sink Station
Place the sink on the right of the veterinary necropsy workstation to match the room layout. Review the approach to the sink, instrument drawer and adjoining casework without assuming transfer-equipment compatibility.








Reference views preserve the existing equipment imagery. Alternate arrangements, older labels, drawings or separately supplied tables may be shown; included equipment follows the selected written scope.
Place the sink on the right of the veterinary necropsy workstation to match the room layout. Review the approach to the sink, instrument drawer and adjoining casework without assuming transfer-equipment compatibility.
Veterinary necropsy configuration
- Right-hand sink configuration for layout-specific prep rooms
- 304 stainless steel construction for sanitation and corrosion resistance
- Hydro aspirator with vacuum breaker (standard)
- Dissection rinse valve and control valve
- Flexible spray hose for cleanup and rinsing
- Waterproof GFCI receptacle for wet work areas
- Large instrument drawer and perforated specimen shelf
- Custom specifications available (layout, plumbing, ventilation, size)
- Any separate table pictured alongside the station is not included unless itemized in the quote.
Listed equipment specifications
Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.
| Material | 304 stainless steel |
|---|---|
| Included utilities | Hydro aspirator, vacuum breaker, spray hose, dissection rinse valve, GFCI receptacle |
| Storage | Large instrument drawer and perforated specimen shelf |
Choose the requested configuration
The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.
Coordinate animal-science casework
Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.
Veterinary casework · Room and cabinet planner · Options and part numbers
Installation, operation and care
Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.
Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.
Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.
Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.
Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.
Complete the necropsy room
Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote
Accessories that belong with this configuration
Match the right-hand sink to the room approach. Separately itemize adjacent casework, instrument storage, lighting and any table pictured.
Coordinate animal-science casework · Specify material, glass and hardware
Planning, care and quote documents
Download the USPE-PET-NC-RH planning and care guide. Includes every listed model code, utilities, care boundaries and the casework material, glass and door-style request form.
This is a planning reference, not a released installation or operating manual. Request the current project drawing and component instructions before commissioning.
Left-Hand Veterinary Necropsy Sink StationUSPE-PET-NC-LH
USPE PET · Necropsy stations
Left-Hand Veterinary Necropsy Sink Station
Place the sink on the left of the veterinary necropsy workstation to match the room layout. Coordinate instrument staging and service access with the neighboring animal-science cabinets.








Reference views preserve the existing equipment imagery. Alternate arrangements, older labels, drawings or separately supplied tables may be shown; included equipment follows the selected written scope.
Place the sink on the left of the veterinary necropsy workstation to match the room layout. Coordinate instrument staging and service access with the neighboring animal-science cabinets.
Veterinary necropsy configuration
- Left-hand sink configuration for layout-specific prep rooms
- 304 stainless steel construction for sanitation and corrosion resistance
- Hydro aspirator with vacuum breaker (standard)
- Dissection rinse valve and control valve
- Flexible spray hose for cleanup and rinsing
- Waterproof GFCI receptacle for wet work areas
- Large instrument drawer and perforated specimen shelf
- Custom specifications available (layout, plumbing, ventilation, size)
- Any separate table pictured alongside the station is not included unless itemized in the quote.
Listed equipment specifications
Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.
| Material | 304 stainless steel |
|---|---|
| Included utilities | Hydro aspirator, vacuum breaker, spray hose, dissection rinse valve, GFCI receptacle |
| Storage | Large instrument drawer and perforated specimen shelf |
Choose the requested configuration
The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.
Coordinate animal-science casework
Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.
Veterinary casework · Room and cabinet planner · Options and part numbers
Installation, operation and care
Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.
Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.
Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.
Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.
Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.
Complete the necropsy room
Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote
Accessories that belong with this configuration
Match the left-hand sink to the room approach. Separately itemize adjacent casework, instrument storage, lighting and any table pictured.
Coordinate animal-science casework · Specify material, glass and hardware
Planning, care and quote documents
Download the USPE-PET-NC-LH planning and care guide. Includes every listed model code, utilities, care boundaries and the casework material, glass and door-style request form.
This is a planning reference, not a released installation or operating manual. Request the current project drawing and component instructions before commissioning.
Stainless Animal Necropsy Sink Service StationUSPE-PET-NC-SS
USPE PET · Service sinks
Stainless Animal Necropsy Sink Service Station
Coordinate an integral sink, continuous rinse, water controls and spray hose in one animal-science service station. Select the eyewash arrangement, drain option and additional receptacle configuration for written review.












Reference views preserve the existing equipment imagery. Alternate arrangements, older labels, drawings or separately supplied tables may be shown; included equipment follows the selected written scope.
Coordinate an integral sink, continuous rinse, water controls and spray hose in one animal-science service station. Select the eyewash arrangement, drain option and additional receptacle configuration for written review.
Veterinary necropsy configuration
- Integral 304 stainless sink basin, 20″ projection from the cabinet
- Continuous rinse
- Hot and cold gooseneck mixing faucet with paddle / wrist-blade controls
- Hydro aspirator with vacuum breaker and flexible hose
- Spray hose with 8 ft flexible hose
- GFCI duplex receptacle, 120 V
- Removable back cover for plumbing access
- 14-gauge (2 mm) 304 stainless steel, heliarc welded and polished, crevice-free
- Floor or wall mount
Listed equipment specifications
Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.
| Overall | 32″ W × 40″ D × 41″ H |
|---|---|
| Cabinet depth | 20″ (sink basin projects a further 20″) |
| Sink rim height | 23″ from the floor |
| Clearance under basin | 9½″ |
| Overall height | 70½″ to the top of the faucet spout |
| Construction | 304 stainless steel, 14 gauge (2 mm), heliarc welded, polished |
| Faucet | Hot/cold gooseneck mixing faucet, paddle / wrist-blade controls |
| Aspirator | Hydro aspirator with vacuum breaker and flexible hose; cold water |
| Spray hose | 8 ft flexible hose sprayer; cold water |
| Electrical | 120 V, 60 Hz, 1 phase, 15 A; GFCI duplex receptacle |
| Water supply | Hot and cold; 58–60 psi and 4 GPM at the hydro aspirator |
| Rear rough-in | 1½″ drain centered 16″ from the left, 7½″ above the floor; hot ½″ at 12″ and cold ½″ at 20″ from the left, both 15″ above the floor; 4″ × 4″ junction box centered 27″ from the left, 21″ above the floor ( rough-in sheet ) |
| Mounting | Floor or wall mount |
Choose the requested configuration
The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.
Coordinate animal-science casework
Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.
Veterinary casework · Room and cabinet planner · Options and part numbers
Installation, operation and care
Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.
Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.
Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.
Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.
Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.
Complete the necropsy room
Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote
Accessories that belong with this configuration
Use the listed eyewash, drain and receptacle choices for this model. Keep requested hoses, water-control changes and added storage separate from the base configuration.
Coordinate animal-science casework · Specify material, glass and hardware
Planning, care and quote documents
Download the USPE-PET-NC-SS planning and care guide. Includes every listed model code, utilities, care boundaries and the casework material, glass and door-style request form.
This is a planning reference, not a released installation or operating manual. Request the current project drawing and component instructions before commissioning.
Animal Necropsy Flushing StationUSPE-PET-NC-FS
USPE PET · Flushing stations
Animal Necropsy Flushing Station
Plan a dedicated flushing-fixture position for an animal necropsy suite. The vitreous china bowl, splash cover and service cabinet form a utility station; permitted waste and tissue-disposal routes require facility approval.














Reference views preserve the existing equipment imagery. Alternate arrangements, older labels, drawings or separately supplied tables may be shown; included equipment follows the selected written scope.
Plan a dedicated flushing-fixture position for an animal necropsy suite. The vitreous china bowl, splash cover and service cabinet form a utility station; permitted waste and tissue-disposal routes require facility approval.
Veterinary necropsy configuration
- Large white vitreous china flushing bowl, wall-hung on the cabinet face
- Splash cover with a port for the necropsy table drain hose
- Push-button flush valve to clear the bowl
- Hot and cold mixing faucet with tall gooseneck spout and wrist-blade handles
- Hydro aspirator with vacuum breaker and reverse flow to relieve suction clogs
- Spray hose assembly with spray nozzle and 8 ft flexible hose
- Backflow protection on all water fixtures
- GFCI duplex receptacle, 120 V, with waterproof cover
- Front service and access panel; open rear for hot, cold and drain connections
- Heliarc-welded, polished 304 stainless steel cabinet
- Floor or wall mount
Listed equipment specifications
Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.
| Cabinet | 32″ W × 20″ D × 40″ H to the top deck |
|---|---|
| Overall depth | 46″ including the flushing bowl |
| Overall height | 70½″ to the top of the faucet spout |
| Bowl rim height | 16½″ from the floor |
| Rear rough-in | 1½″ drain centered 16″ from the left, 7″ above the floor; hot ½″ at 12″ and cold ½″ at 20″ from the left, both 15″ above the floor; 4″ × 4″ junction box centered 27″ from the left, 21″ above the floor ( rough-in sheet ) |
| Construction | 304 stainless steel, heliarc welded, polished finish |
| Flushing fixture | Wall-hung vitreous china bowl with push-button flush valve |
| Faucet | Hot/cold mixing, tall gooseneck spout, wrist-blade handles |
| Aspirator | Hydro aspirator, vacuum breaker, reverse flow; cold water |
| Spray hose | Spray nozzle, 8 ft flexible hose |
| Electrical | 120 V, 60 Hz, 1 phase, 15 A; GFCI duplex receptacle with waterproof cover |
| Water supply | Hot and cold; 58–60 psi and 4 GPM at the hydro aspirator |
| Flush valve pressure | 10–100 psi; low-consumption valves need 25 psi running pressure |
| Mounting | Floor or wall mount |
Choose the requested configuration
The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.
Coordinate animal-science casework
Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.
Veterinary casework · Room and cabinet planner · Options and part numbers
Installation, operation and care
Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.
Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.
Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.
Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.
Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.
Complete the necropsy room
Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote
Accessories that belong with this configuration
Review the flushing bowl, splash cover, supply, drain and permitted waste route. This is not a disposal approval or a replacement for facility waste procedures.
Coordinate animal-science casework · Specify material, glass and hardware
Planning, care and quote documents
Download the USPE-PET-NC-FS planning and care guide. Includes every listed model code, utilities, care boundaries and the casework material, glass and door-style request form.
This is a planning reference, not a released installation or operating manual. Request the current project drawing and component instructions before commissioning.
Animal Science Necropsy Table with SinkUSPE-PET-NC-ST
USPE PET · Necropsy stations
Animal Science Necropsy Table with Sink
Request the existing sink-equipped table platform for a dedicated animal-science necropsy arrangement. Select the documented left- or right-hand sink; specimen support, capacity and the proposed necropsy application require written review.




Reference views preserve the existing equipment imagery. Alternate arrangements, older labels, drawings or separately supplied tables may be shown; included equipment follows the selected written scope.
Request the existing sink-equipped table platform for a dedicated animal-science necropsy arrangement. Select the documented left- or right-hand sink; specimen support, capacity and the proposed necropsy application require written review.
Veterinary necropsy configuration
- Integrated Sink and Faucet Equipped with a built-in sink and faucet, perfect for procedures requiring immediate access to water, enhancing hygiene and efficiency.
- Superior Stainless Steel Craftsmanship Constructed in the USA using high-grade stainless steel, this table features a marine edge to prevent liquid spills and ensure longevity in even the busiest vet offices.
- Custom Configurations Available Choose from a range of custom lengths, depths, and working heights to integrate seamlessly with your facility’s layout.
- Storage Options & Color Choices Add drawers or doors, available in classic stainless or a range of powder-coated finishes. Tailor the unit to match your clinic’s workflow and aesthetic.
- Marine-edge worktop with integrated sink and faucet.
- Custom dimensions, drawer/door layouts and powder-coated storage finishes are quote requests, not verified base specifications.
Listed equipment specifications
Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.
| LEFT HAND SINK | Sink basin and faucet installed on the left-hand side |
|---|---|
| RIGHT HAND SINK | Sink basin and faucet installed on the right-hand side |
Choose the requested configuration
The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.
Coordinate animal-science casework
Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.
Veterinary casework · Room and cabinet planner · Options and part numbers
Installation, operation and care
Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.
Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.
Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.
Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.
Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.
Complete the necropsy room
Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote
Accessories that belong with this configuration
Confirm the documented left- or right-hand sink. Drawers, doors, finish changes, capacity and veterinary necropsy suitability need their own written scope.
Coordinate animal-science casework · Specify material, glass and hardware
Planning, care and quote documents
Download the USPE-PET-NC-ST planning and care guide. Includes every listed model code, utilities, care boundaries and the casework material, glass and door-style request form.
This is a planning reference, not a released installation or operating manual. Request the current project drawing and component instructions before commissioning.
Animal Necropsy Station and Casework PackageUSPE-PET-NC-CW
USPE PET · Casework packages
Animal Necropsy Station and Casework Package
Coordinate an animal necropsy station with integrated cabinet storage and water-control plumbing. Build an itemized room schedule so the station, cabinet sizes, finishes and installation responsibilities remain clear.


Reference views preserve the existing equipment imagery. Alternate arrangements, older labels, drawings or separately supplied tables may be shown; included equipment follows the selected written scope.
Coordinate an animal necropsy station with integrated cabinet storage and water-control plumbing. Build an itemized room schedule so the station, cabinet sizes, finishes and installation responsibilities remain clear.
Veterinary necropsy configuration
- 304 stainless steel with welded construction.
- Integrated station, sink, water-control plumbing and casework storage.
- Configurable cabinet storage; final cabinet schedule and included components are itemized in the quote.
Listed equipment specifications
Reference specifications describe the existing equipment platform. Final veterinary configuration and utility rough-in require the approved project drawing.
Overall dimensions, connection locations and the final included fixture schedule are confirmed by project drawing; no unverified dimensions are substituted.
Choose the requested configuration
The configuration selector retains the documented equipment choices. Each request remains quote-only; optional components are not included unless selected and itemized.
Coordinate animal-science casework
Add the exact station model, configuration and quantity to the same equipment quote as your cabinets. Include room zone, worktop cutout, handedness, working height, plumbing/service clearance and finish requests. Cabinet fit is not assumed from a shared width label.
Veterinary casework · Room and cabinet planner · Options and part numbers
Installation, operation and care
Qualified personnel must verify dimensions, support, service access, utilities, backflow protection and electrical protection. Isolate utilities before maintenance. Do not commission damaged equipment or equipment with leaks, loose supports or electrical defects.
Follow component instructions and the facility's approved cleaning protocol. Confirm agent, dilution, contact time and material compatibility. No pathogen-inactivation or sterilization claim is made. Do not mix chemicals or clean through electrical components.
Veterinary application, specimen dimensions and load, component compatibility, drainage, electrical supply and any ventilation requirement must be confirmed in the written quote and approved project documents. This station is not represented as a biosafety cabinet, containment system or clinical fluid-administration device.
Download the USPE PET model planning and care manual from the document section. This original reference is not a released operating procedure, fabrication drawing, disinfection validation or installation approval. Obtain the current supplied-component operating instructions before commissioning.
Original equipment images are retained as platform references, including alternative configurations, drawings and separately supplied equipment. Image labels may differ from the catalog code. Confirm the supplied model, handedness and included components in the written quote.
Complete the necropsy room
Compare necropsy stations, service sinks, flushing stations and water controls · Animal-science laboratory refrigeration · Review the equipment and casework quote
Accessories that belong with this configuration
Prepare an itemized station and cabinet schedule. Coordinate the water control, top, sink, storage, service clearances and requested glass or hardware by cabinet model.
Coordinate animal-science casework · Specify material, glass and hardware
Planning, care and quote documents
Download the USPE-PET-NC-CW planning and care guide. Includes every listed model code, utilities, care boundaries and the casework material, glass and door-style request form.
This is a planning reference, not a released installation or operating manual. Request the current project drawing and component instructions before commissioning.
Examination and treatment models are listed separately below. They are not automatically substitutes for a veterinary necropsy station.
Clinical examination and treatment tables are separate models from an approved necropsy configuration. For a compact dissecting sink or a larger custom animal station, send the proposed procedure and room requirements.
Necropsy room equipment, organized around the work
A veterinary exam room, an animal necropsy room and a pet aftercare facility need different equipment schedules. Start with the procedure, specimen dimensions and route through the building, then compare the relevant tables, sinks, storage and handling equipment. A product name alone does not establish capacity, utility requirements or suitability for a particular species.
Animal necropsy workstation layout
Plan the work surface, operator access, basin arrangement, drainage and instrument space for veterinary post-mortem examination. For small-animal necropsy, include the specimen envelope and handling method; for larger animals, request a project-specific equipment review rather than scaling up a small table by assumption.
Compare necropsy station modelsVeterinary examination and treatment
Compare wall-mount, freestanding, knee-space and sink-equipped table layouts for the intended clinical task. Examination equipment is not automatically a necropsy station. Review the selected model's support requirements and configuration before specifying it for a different procedure.
Review veterinary table modelsSink, instrument and specimen areas
Identify where rinsing, instrument staging and specimen preparation will occur. Put water supply, drainage, electrical connections, storage and any requested ventilation review into the room schedule instead of assuming that every fitting is included with the table.
Plan veterinary laboratory caseworkAnimal storage and transfer
Review the path between receiving, the examination area and the selected storage system. Include doorway clearances, tray support, transfer heights and handling equipment. A shared product category does not establish compatibility between a lift, tray, rack and cooler.
Use the animal aftercare cooler guideBuild a room specification, not just a table list
A useful veterinary pathology equipment request explains how the room will be used and what the equipment must connect to. Send the floor plan or available dimensions, the expected specimen range, the number of work positions and the equipment already in service. Identify any requirement that still needs a facilities, safety or engineering decision.
Working envelope and access
Record usable floor space, wall clearance, doorway width, working height and the approach for staff and transfer equipment. Distinguish the table's usable surface from its overall footprint and protruding fixtures. Include access for cleaning and service.
Water, drainage and ventilation
List available services and the facility contacts responsible for confirming connections. A spray hose, basin or downdraft description does not establish room-level safety performance. Request the selected configuration's requirements and have the responsible facility team review them.
Materials and cleaning
State the proposed cleaning process and any chemical or finish restrictions. Request documentation for the actual supplied materials, joints and accessories. Do not assume that every stainless component has the same grade or that one cleaning agent suits every finish.
Options and existing equipment
Separate the base item from requested hoses, lighting, shelves, instrument supports, trays, storage and other accessories. Include the model numbers of equipment that must interface with the proposed station. Requested options remain subject to configuration review.
Different facilities, clearly defined requirements
Veterinary hospitals can begin with examination and treatment layouts. Diagnostic laboratories and veterinary pathology departments can organize necropsy and specimen work around their procedures and room services. University anatomy and teaching facilities can include instructor access, student positions and specimen handling in the request. Shelters and animal-care organizations can keep examination, storage and aftercare requirements distinct.
Large-animal, equine, wildlife and research applications need their own dimensions and handling review. Those terms describe a planning scope, not a claim that every listed model is suitable for those applications. Send the actual use case before selecting a model or assuming a capacity.
One animal-equipment schedule for quote and PO review
Choose the exact product model and configuration, set the quantity, then record requested options separately. For a multi-room project, identify which items belong to each work area and which existing components need to remain. USPE equipment follows the specification-quote path; submitting a request does not place an order or confirm engineering approval.
- Equipment: Product name, model or SKU, quantity and selected configuration.
- Requested changes: Dimensions, accessory choices, service connections and interfaces needing review.
- Site: Facility type, delivery ZIP code, access constraints and room information.
- Documents: The required drawings, material information, operating instructions and procurement paperwork.
Review the written scope, included components, installation responsibilities, freight and applicable product-specific warranty terms before accepting the quote. A reference image is not a fabrication drawing, and a proposed CAD assembly is not a released production specification.
Veterinary necropsy equipment questions
Can an examination table be used as a veterinary post-mortem table?
Not by assumption. Review the intended procedure, surface, drainage, access and documented model scope. A clinical examination table requires a separate configuration review before it is specified for necropsy.
What belongs in a necropsy room equipment schedule?
List the selected workstation, sink and water controls, instrument area, casework and any animal storage or transfer equipment. Record model references, quantities, room dimensions and available utilities. Keep requested accessories and ventilation requirements separate from the base equipment scope.
How should small-animal and large-animal requirements be specified?
Include specimen dimensions, expected load, access, transfer method and the room plan. A large-animal application requires its own configuration review rather than an assumed extension of a smaller model.
Does a sink or downdraft description confirm the room utilities?
No. Ask for the selected configuration requirements and have the responsible facilities and safety teams review water, drainage, power and any ventilation connections.
Can I request different accessories or dimensions?
Yes, include requested changes in the RFQ. They remain requests until the written scope confirms what can be supplied and what supporting review is required.
Are trays, lifts and storage racks automatically compatible?
No. Width labels and a shared category do not establish fit. Confirm bearing surfaces, retention, transfer heights, clearances and the approved equipment combination.
How do I prepare a veterinary equipment RFQ?
Provide the exact model or required function, quantity, requested options, facility use, delivery ZIP code and available room information. Identify the drawings and procurement documents you require.
Are drawings on the site released manufacturing drawings?
Only a specifically released drawing with the appropriate revision and approval should be used for manufacturing or installation. Reference photos and review CAD do not establish engineering approval.
Your animal facility. One USPE PET quote.
Send the equipment list or project outline so the model, quantity and requested configuration can be reviewed together. Keep final dimensions, compatibility and included services in the written scope.
Request a USPE PET necropsy quote





