U.S. Pathology Equipment

USPE equipment

USPE Ventilated Wall-Mount Embalming Station

Specifications, drawings & manuals

Model: USPE-VES-C

Quote only

Request a quote for your selected model and configuration.


Configuration review only; confirm selected options in your quote.

Applies when a hose is included in the requested configuration. Color, braided construction, fittings and availability require written quote confirmation.

Confirm custom dimensions, materials, load ratings, tray and rack compatibility, and freight in your written quote before ordering.

1-888-792-9315
140 Kwick Way Lane, Building 7, Johnson City, TN 37615

Product details

USPE Ventilated Wall-Mount Embalming Station is supplied through the USPE quote-only equipment family. Review the model schedule, select your requested configuration and download the applicable drawing before requesting a coordinated equipment quote.

Configuration and model selection

USPE Ventilated Wall-Mount Embalming Station is a wall-mounted ventilated station to coordinate with a compatible tray-based preparation table. Choose the required model or reference build and request an itemized written quotation. Exact dimensions, utility connections, installed clearances, accessory fit and scope are finalized in the approved project submittal.

Selection Documented reference
USPE-VES-C | Center sink 34 L × 114 W × 61 H inches mounted
USPE-VES-D | Double sink 34 L × 132 W × 61 H inches mounted

Materials, features and services

Selection Documented reference
Material 304 stainless steel, No. 4 finish
Sink 19.8 L × 34.8 W × 5.8 D inches
Reference equipment 0.5 HP waste disposal, reverse-flow aspirator, 10 ft spray hose, rinse assembly, GFCI receptacles, lighting, drawer, specimen shelf and cart-lock mechanism
Water 60–65 psi at 4 GPM; rough-in determines final connection sizes
Exhaust reference 400–450 CFM at 0.25 in. W.G.
Electrical Two 115V / 60Hz / 1 phase / 15A circuits; station and disposal separated

Published mounted height excludes the exhaust connection. Review this station with the USPE-VET-23 or USPE-VET-27 table as a matched system, with final connection geometry confirmed; do not assume universal cart or table interchangeability.

Technical drawings for each configuration

  • Original USPE dimensional planning drawing in preparation. Request the current model document.
  • Original USPE dimensional planning drawing in preparation. Request the current model document.

The approved project submittal defines the accepted USPE dimensions, utilities and equipment scope. Planning drawings are not fabrication releases.

Facility planning and related equipment

For a hospital pathology service or medical examiner facility, coordinate the equipment with utilities, ventilation, delivery access and the actual task. For a university anatomy laboratory, review teaching access and accessory use separately. For funeral-home preparation rooms, confirm the preparation workflow and table/station interface instead of choosing from appearance alone.

Pathology laboratory planning · Medical examiner and morgue equipment · USPE laboratory casework planning · Ventilated tables and station coordination

Procurement, origin and standards documentation

Request model-specific procurement references, material details, country-of-origin substantiation and any required certification or test documentation with your RFQ. Stainless steel construction is not itself an NSF listing, UL listing or ADA compliance certificate. No blanket “100% American made,” NSF, UL or third-party certification claim is asserted without documentation for the selected configuration.

Procurement classification reference desk explains NAICS industry references, UNSPSC commodity or class references, HS/HTS review and Shopify / Google categories. Final customs and bid classifications require the exact selected goods and scope.

Request a quote, send an RFQ or submit a PO for review

Choose the configuration and quantity, add the equipment and options to your USPE quote request, then include your delivery ZIP, facility, exact utility requirements and relevant non-sensitive drawings. Optional accessories and custom work are quoted separately unless explicitly included in the accepted scope.

USPE quote basket and request form · RFQ / PO request · Email a PO or RFQ with attachments · Document library

Attach the PO or RFQ to your email before sending. A purchasing document is reviewed against the accepted written quote; submitting a request is not automatic order acceptance. Do not include patient information.

Configuration drawing and sign-off

Match the model and selected options to your written quote. These are unsigned review documents, not operating manuals, approved shop drawings or safety certifications.

No approval or signature has been supplied. Final dimensions, purchased parts, engineering, supply and applicable legal/IP review remain separate release requirements.

Model-specific purchasing information

Plan your USPE Ventilated Wall-Mount Embalming Station purchase

Product type: Pathology Equipment

Configuration
Center sink, Double sink

Review the selected configuration, included components and product specifications above. Add eligible items through this product’s cart or quote controls; custom and quote-only equipment use the request action provided for this model.

Read the applicable written warranty information. Ask a documentation question and include the product name and selected configuration.

Configure the equipment request

Browse all equipment options and SKUs

The model selector above identifies the requested base configuration. Optional equipment and custom requirements below are requests for review, not confirmed retrofits, included parts or certification claims.

Custom requirements and documentation
Documentation required with the quote

Selecting a requirement does not certify the product. The written quote must identify what evidence applies to the accepted configuration.

Review equipment quote request