Replacing a mortuary cooler raises a practical question buyers often don't plan for until the new unit arrives: what happens to the old one.
Key takeaways
- Refrigeration equipment contains refrigerant that requires proper recovery and disposal under EPA regulations, not simple scrapping.
- Plan old-unit removal around new-unit delivery and installation so your facility isn't without adequate storage capacity during the changeover.
- Confirm your disposal vendor follows correct refrigerant recovery procedures.
Trade-in considerations
Ask about trade-in or removal options when placing a new equipment order rather than after — coordinating disposal alongside delivery avoids a facility running two units or an awkward gap in storage capacity.
Proper disposal
Refrigeration equipment contains refrigerant that requires proper recovery and disposal under EPA regulations, not simple scrapping. Confirm your disposal vendor follows correct refrigerant recovery procedures.
Timing the transition
Plan old-unit removal around new-unit delivery and installation so your facility isn't without adequate storage capacity during the changeover.
Equipment related to this guide

SKU: AMC-0810-LH-8

SKU: #FS1-1000-1 · Model: FS1-1000-1

SKU: FS1-FC-500E-Q1 · Model: FS1-FC-500E

SKU: Model 500-BCL-P-1
| Product | SKU / model | Catalog price (checked Nov 19, 2026) |
|---|---|---|
| 8x10 Walk-In Mortuary Refrigerator | AMC-0810-LH-8 | $10,800.57 |
| TITAN Standard Hydraulic Embalming Table | #FS1-1000-1 | $2,727.45–$10,909.80 |
| TITAN 500E Standard Mortuary Cot, 500 lb | FS1-FC-500E-Q1 | $890.53–$7,124.24 |
| TITAN Power Body & Casket Lift XL, 1,000 lb | Model 500-BCL-P-1 | $3,204.36 |
Prices are the current listed catalog prices and can change; options, freight and installation are quoted separately. Open each product page for full specifications.
Frequently Asked Questions
When should I ask about trade-in or disposal options?
When placing your new equipment order, so removal can be coordinated alongside delivery rather than arranged separately afterward.
Can old refrigeration equipment just be scrapped?
No, it contains refrigerant that requires proper recovery and disposal under EPA regulations — confirm your disposal vendor follows correct procedures.
How do I avoid a capacity gap during a cooler replacement?
Plan old-unit removal timing around new-unit delivery and installation so your facility maintains adequate storage capacity throughout.
Planning a cooler replacement?
Ask us about coordinating trade-in and disposal timing with your new equipment order.
Call 1-888-792-9315 or email cool@mymortuarycooler.com