Resources

Refrigerant Safety Symbols & Warnings

A2L refrigerant safety symbols & warnings for mortuary cooler refrigeration — flammable-gas pictograms, required warning text (EN/FR) & safe service rules. SY-1.0.

COMPLIANCE & PRODUCT SAFETY CENTER™

Refrigerant Safety Symbols & Warnings — A2L Refrigeration Systems

DOCUMENT SY-1.0 • EFFECTIVE MAY 1, 2026 • LAST REVIEWED JULY 4, 2026 • KEPT CURRENT WITH MANUFACTURER DOCUMENTATION

Why this page exists: 2025–2026 packaged refrigeration systems — including the Heatcraft PRO³ units used on self-contained mortuary coolers — use next-generation A2L refrigerants (such as R-454B), classified as lower-flammability refrigerants under the EPA AIM Act transition. Every unit carries standardized warning symbols. Know them, and make sure every operator in your facility knows them. Source: manufacturer installation & operation manuals — always follow the manual shipped with your specific unit (Manuals & Startup Guides).

The Symbols and Their Meanings

A2L — Warning: Risk of fire / flammable materials

A2L
Warning: Risk of fire / flammable materials

Warning — Hazard Category 1 Flammable Gases (GHS pictogram)

GHS Flammable Gas
Warning: Hazard Category 1 Flammable Gases

Required Warning — Post Where Operators Will See It

WARNING

Do not use means to accelerate the defrosting process or to clean, other than those recommended by the manufacturer.

The appliance shall be stored in a room without continuously operating ignition sources (for example: open flames, an operating gas appliance, or an operating electric heater).

Do not pierce or burn.

Be aware that refrigerants may not contain an odor.

MISE EN GARDE (Canada — traduction française requise)

Ne pas utiliser de moyens autres que ceux recommandés par le fabricant pour accélérer le processus de dégivrage ou pour nettoyer l’appareil.

L’appareil doit être entreposé dans un local ne contenant pas de sources d’inflammation permanentes (flammes nues, appareil à gaz ou dispositif de chauffage électrique en fonctionnement, par exemple).

Ne pas percer ou brûler.

Attention, les fluides frigorigènes peuvent ne pas dégager d’odeur.

Handling & Service Rules for A2L Units

1. Ensure the structural integrity of the cooler box can support the weight of the PRO³ unit — see the manufacturer tech bulletin for unit weights (manuals library). 2. Avoid contact with sharp edges and coil surfaces — they are an injury hazard; wear gloves during moving and handling. 3. Disconnect all power sources before any service work. 4. Service, recovery, and charging must be performed by EPA §608-certified technicians using A2L-rated equipment — see RF-1.0 and TP-1.0 stop-use conditions. 5. Never modify, pierce, braze on a charged circuit, or bypass safety controls — unauthorized modification voids warranty (WR-1.0) and creates fire risk.

Symbols shown are standardized GHS/ISO-style safety pictograms reproduced for operator education. Always follow the exact labels, manual, and warnings shipped with your specific unit; manufacturer documentation controls. Heatcraft trademarks belong to Heatcraft Refrigeration Products LLC — AMC is an authorized dealer. Related: refrigeration efficiency guidance • Energy & Environmental Center (EN-1.0) • Standards Center™.

Questions about A2L refrigerants or your unit's warnings?

We'll pull your model's manual, confirm its refrigerant, and walk your team through safe operation.

Call 1-888-792-9315 or email cool@mymortuarycooler.com

American Mortuary Coolers • Johnson City, TN • Document SY-1.0 • Reviewed with each manufacturer manual revision

Shop Mortuary Coolers for Funeral Homes

Compare the actual equipment below, choose the required options and add an eligible configuration to your cart. Quote-only and configured systems retain their dedicated product path.

  1. Choose the equipment
  2. Select options and quantity
  3. Review your cart or itemized quote
2 Body Standard Roll-In Mortuary Cooler – Model 2BR

2 Body Standard Roll-In Mortuary Cooler

SKU 2BR
From $7,414.11
Estimated from Check financing Equipment estimate. Approval required. Tax and delivery extra.

Built to orderPO accepted

Configure & price Add to quote
3-Body Extra-Wide Mortuary Refrigerator
MADE IN
THE USA

3-Body Extra-Wide Mortuary Refrigerator

SKU 3BX
From $8,770.41
Estimated from Check financing Equipment estimate. Approval required. Tax and delivery extra.

PO accepted

Configure & price Add to quote
4-Body Extra-Wide Mortuary Cooler
MADE IN
THE USA

4-Body Extra-Wide Mortuary Cooler

SKU 4BX
From $9,107.01
Estimated from Check financing Equipment estimate. Approval required. Tax and delivery extra.

Built to orderPO accepted

Configure & price Add to quote
3-Body Mortuary Refrigerator
MADE IN
THE USA

3-Body Mortuary Refrigerator

SKU 3B
From $8,315.01
Estimated from Check financing Equipment estimate. Approval required. Tax and delivery extra.

PO accepted

Configure & price Add to quote

Compare cold storage around the space and loading plan

Start with the equipment you need to move into storage, the usable room dimensions and the available access route. An upright refrigerator, a roll-in cooler and a walk-in system are different configurations; compare their actual listings before choosing.

  • Capacity and access: confirm the listed storage arrangement and loading direction.
  • Fit: compare exterior and usable dimensions, door clearance and the delivery route.
  • Configuration: identify refrigeration, floor, rack and tray selections separately.
  • Project scope: confirm utilities, delivery requirements and the applicable written warranty.

Plan a phased mortuary-cooler replacement

Start with an inventory of the equipment in service, its dimensions and the workflow that must stay available during replacement. Identify the units needed first, the interfaces that must remain compatible and the later phases you want to budget. Separate a planning quantity from an approved purchase.

  • For each phase, identify the model or specification, quantity, delivery location and intended purchasing period.
  • Record dependencies such as door clearances, loading direction, transfer height, tray size, floor conditions and utilities where relevant.
  • Request separate line items for equipment and selected accessories so the order can be reviewed by location and fiscal period.
  • Review quote validity, current availability and delivery requirements before approving each phase; a planning quote is not a promise of a fixed future price.

Request a phased equipment or multi-location quote with the first purchase and later requirements clearly identified. Use the same approach for an independent facility, a public department or a corporate equipment-replacement program.

For several products or locations, request an itemized Mortuary Coolers for Funeral Homes quote with selected models, quantities and delivery ZIP codes. Use general customer support for selection questions, and review the written warranty terms before ordering.

Plan year-end equipment purchases around the actual equipment and timing

Review current catalog prices, choose the required configuration and separate the first purchase from later replacement phases. Build an itemized priced quote, or request a formal equipment quote with quantities, locations and your purchasing period. Request written price validity rather than assuming an unannounced future price increase or an additional sale discount.

Can Section 179 affect an equipment purchase?

For tax years beginning in 2026, IRS Revenue Procedure 2025-32 sets a maximum Section 179 expense deduction of $2,560,000, reduced when qualifying property placed in service exceeds $4,090,000. These are statutory limits, not a promise that this purchase or every buyer qualifies.

The IRS explains that property is generally placed in service when ready and available for its specific use. Eligibility, business use, taxable income and other requirements matter; ordering, financing or paying before year-end does not by itself establish a deduction. Confirm treatment and timing with your tax professional before relying on a tax benefit.

Use our 2026 Section 179 planning guide and illustrative calculator alongside the selected model's requirements. Confirm freight, installation responsibilities and availability separately; a year-end planning request is not a delivery guarantee.

Compare your options. Choose your next step.

One source for funeral supplies and mortuary equipment, with nationwide shipping. Review the Mortuary Coolers for Funeral Homes selection, compare product specifications and current pricing, then order the configuration you need or request an itemized quote.

  1. Choose the modelCompare the details against the work you need to do.
  2. Set your quantitiesReview the selected options and equipment subtotal.
  3. Buy or request a quoteReview freight, tax and available payment terms separately.

Need several items or delivery to more than one location? Include the models, quantities and delivery ZIP codes in your request. For general questions, contact customer support.